[real estate in Vietnam] RAEMIAN GALAXY CITY is a combination of high-end apartments and villas in the CBD center of the second county of ho chi minh CITY, Vietnam

***RAEMIAN GALAXY CITY***


02.jpg

I. introduction


  • Developer: HDTC residential development and trading co

abbreviations HDTC (HousingDevelopment And Trading Joint Stock Company)(registered capital reaches 2.242 billion dong)

Website:http://hdtc.com.vn/vi/gioi-thieu


  • Project name: star city, USA


  • Location: anfu fang, anfu-anqing new district, county 2, ho chi minh city


  • Main contractors: Hoa Binh, Coteccons, An Phong, Delta (housing foundation)


  • Project consultation: Apave (France) -- management: Artelia (France)


  • Architectural design: han-guk Architects & Engineers


  • Property management: Savista Company & Samsung C and T


03.jpg

  • Type: grade A residential apartment, office building, independent small building, shopping center

  • Project scale: An Phu -- An Khanh new urban area (total area 131 hectares), overall planning 1/500 (24.7 hectares)

  • Total number of apartment buildings: 24

  • Floors: 40

  • Total number of apartments: 13,092

04.jpg



  • Residential areas: 8 residential areas (CT01, CT02, CT03, CT04, CT05, CT06, CT07 and CT08)

05.jpg

II. Location:


  • Adjacent to liang dingguo road (30 square meters), connecting shoutian 2 bridge, shoutian huancheng avenue, mei zhishou and longcheng oil coconut highway


  • Three main roads: Luong Dinh Cua avenue, 30 meters wide, A2 street, 16 meters wide, Tran Luu avenue, 30 meters wide, leading to Thu Thiem 1,2,3,4 bridge, Thu Thiem main road Dai Lo Vong Cung Thu Thiem, Mai Chi Tho expressway and Long thanh-dau Diay expressway.

 

06.jpg

 

  • Smooth traffic:


07.jpg

- 5 minutes from anfu Mega Market


- only 7 minutes from Vincom, Hanoi bridge


- 20 minutes from the CBD center of ho chi minh city


-30 minutes from xinshanyi airport


- it's 20 minutes from the subway station


5 minutes away


-The first county 


-metro line 2


- Vincom mall


- parkson mall


- Estella Height s, Singapore


- American international hospital (AIH)


- Australian international school (AIS)


- nursery, kindergarten, middle and high school


- fun place in snow town


- Hue Nghiem II pagoda


- Thu Thiem main road Dai Lo Vong Cung Thu Thiem


- Mai Chi Tho highway


Long Thanh- DauDiay highway


10-15 minutes away


The ninth county


- 7 county


-suoi Tien theme park, county 9


- second county Long Thanh golf club


-- Rach Chiec sports city, county 2


- industrial Binh Duong


- industrial zone Dong Nai


 

08.jpg


III. The floor plan


09.jpg

10.jpg

15.jpg

11.jpg

12.jpg

13.jpg

14.jpg


 

IV. Selling stage


Phase 1 sale: ct3-ct4


* position:

N: Tran Luu St.


Nan: Luong Dinh Cua St.


East: No. 37 St.


West: A2 St.

 

Introduction to CT3


16.jpg


Total area: 21.222 square meters, a total of 4 buildings: 301,302,303,304


Floors: 40 floors, including shopping shopping mall 2 floors, basement 2 floors, apartment 38 floors


Area: 54-143 square metres (1-4 bedrooms)


1BR: area 54 square meters (2 sets/floor)


2BR: area 74.46 square meters (4 sets/floor)


3BR: there are 3 kinds, with area from 99 to 124 square meters (8 sets/floor)


4BR: carpet area 135.05 square meters (1 set/floor)



17.jpg

  • Guarantee Bank: it is basically confirmed that it is the local Bank of Vietnam of Maritime Bank, and the financial support comes directly from 70% of the mortgage loans of the developer, including foreign customers. It is the only project that can support foreign loans.


V. inner zone matching:


  • Green park: fitness garden, yoga garden, art garden, studio garden, barbecue garden, garden, picnic garden, party garden, rehabilitation garden.

  • Gym, outdoor swimming pool, shopping center, scenic lake, public living area, children's playground, tree house, tennis court, fountain square.

 

18.jpg

VI. Model houses:

 

19.jpg

20.jpg

VII. Unit price and payment terms:


Expected unit price: 70 million dong/square meter (including VAT) (about 3000 usd/square meter)

Construction progress: the foundation and basement have been completed

Expected delivery time: the fourth quarter of 2020 (CT3 and CT4)

Expected opening time: the second quarter of 2019 (ct3-302 building), the opening time varies according to the construction schedule

Ownership: permanent (Vietnamese buyers), 50-year property rights (foreigners)


  • Payment terms:


21.jpg

VIII. Room delivery configuration:


22.jpg

23.jpg
24.jpg
25.jpg
26.jpg
27.jpg
28.jpg
29.jpg
30.jpg


This article is excerpted from the network